Login « Sidebar
Museum Home Page Internal Fire Gallery » Museum Engines » Tydd Gote
 
Page: 1 2 3 4 5 6
 

Tydd Gote

Date: 27/04/07
Owner: Gallery Administrator
Size: 52 items
The block on the way into the workshop ready for collection later.

The block on the way into the workshop ready for collection later.

Date: 15/07/07
Views: 544
First block off.

First block off.

Date: 15/07/07
Views: 492
First block heading for the far end of the station

First block heading for the far end of the station

Date: 15/07/07
Views: 505
Big end assemblies

Big end assemblies

Date: 15/07/07
Views: 527
Big pile of bits at the end of the first week of dismantling

Big pile of bits at the end of the first week of dismantling

Date: 23/06/07
Views: 536
Workshop end stripped back.

Workshop end stripped back.

Date: 23/06/07
Views: 527
Air piping off

Air piping off

Date: 23/06/07
Views: 488
Inlet valves, camshaft and fuel pump brackets removed

Inlet valves, camshaft and fuel pump brackets removed

Date: 23/06/07
Views: 477
Start of dismantling, pumps and injectors out

Start of dismantling, pumps and injectors out

Date: 23/06/07
Views: 486
 
Page: 1 2 3 4 5 6
 

Actions

Advanced Search
View Slideshow

Museum Engines

1. Imperial... ... 20. Start-o-Mat... 21. GM Two-Stroke 22. Bristol... 23. Sulzer Diesel 24. Tydd Gote 25. Elan Valley... 26. St Ann's...
Powered by Gallery v2.3 Copyright 2011 Internal Fire Museum of Power .