|
|
|
|
Sulzer 1D25 |
| Description | Image |
|---|---|
| Start of dismantling at Somerford |
|
| Shot taken during installation of the main engine at Somerford in 1923.Image from the SSW archive courtesy of Chris Pattison. |
|
| During dismantling at Somerford 2004 |
|
| During dismantling at Somerford 2004 |
|
| Shuttered and ready for pouring |
|
| Concreted and ready for assembly. |
|
| Bed with lower bearing halves fitted and bottom section of vertical shaft. |
|
| Crank and flywheel in |
|