Master record (return to list)

Search for:-
Object Name Description Object Date Manufacturer Works Number Status Category Accession No Image
Cochran Borderer Boiler 3000lbs/hr oil fired boier 1995-07-10 BIB Cochran 25/1351 Not On Display Steam Machinery IF:2014:389
Actions Heading Entry Entry Date
Strip Boiler stripped to bare shell and sent to repairers. Door sent up to Cochra... more
Boiler stripped to bare shell and sent to repairers. Door sent up to Cochran for new lining and mod to Riello burner.
2018-06-01
Returned from repair Boiler returned from repair. Shell sandblasted and corroded flange faces so... more
Boiler returned from repair. Shell sandblasted and corroded flange faces sorted. Shell moved into boiler room.
2018-11-04
Assembly Basic assembly complete, new flue fitted and piped up to main. New feed pum... more
Basic assembly complete, new flue fitted and piped up to main. New feed pump fitted and new Riello burner. New boiler control box built by volunteer Robert Postance
2019-02-01
Commissioning Mobrey controls serviced by Rosemount and boiler steamed for the first time... more
Mobrey controls serviced by Rosemount and boiler steamed for the first time by boiler inspector. No issues and cert given.
2019-02-21
Annual Test Boiler tested, no problems. 2019-02-04