Master record (return to list)
Object Name | Description | Object Date | Manufacturer | Works Number | Status | Category | Accession No | Image |
---|---|---|---|---|---|---|---|---|
Triple Expansion Marine Engine | Triple expansion marine engine from the Bristol tug Medway. On loan from B... more | 1903-01-01 | Simpson & Strickland | On Display | Steam Machinery | IF:LN:2019:001 |
Actions | Heading | Entry | Entry Date | |
---|---|---|---|---|
|
Initial Inspection/Installation | Basic inspection performed on arrival, engine in good overall condition wit... more | 2019-07-05 | |
|
IP Timing | 1/32" packing under IP valve rod to correct timing. Engine now running mu... more | 2019-07-07 | |
|
LP Timing Checked | LP slide valve cover removed and valve opening at centres checked. In forwa... more | 2022-09-16 |