793
Engine arrived at the museum. Unloaded between Halls 1 & 2 it was pushed into Hall 2 on skates by the HIAB.Jacks and rollers were used to move it into Hall1. It was then jacked to the height of the step and skated sideways on steel plates until in position. In-situ at 7:30 pm that night.
Paul Evans
2005-07-19