Removal from Somerford Pumping Station, Brewood, Wolverhampton.
Removal took 6 man days and was performed by Paul Evans, Keith Farley and Roland Craven.
2005-03-28
First public running at the Easter Crankup. The Sulzer ran faultlessly on two occasions.
2006-07-20
The Sulzer was awarded a Heritage Award from the Institution of Diesel and Gas Turbine Engineers in recognition of the restoration and return to running order by the museum staff.